1 min read





A SECTION OF the new rolling gates for the Panama Canal’s third set of locks towers over workers during a press tour in Gatun, Panama, on Thursday. As part of the canal expansion program, the first four gates for the new locks have arrived from Italy for a total of 16 rolling gates that each weigh an estimated 3,100 tons. The construction of the third set of locks will allow the passage of post-Panamax vessels or container ships much too big to fit through the Panama Canal’s old locks.
A SECTION OF the new rolling gates for the Panama Canal’s third set of locks towers over workers during a press tour in Gatun, Panama, on Thursday. As part of the canal expansion program, the first four gates for the new locks have arrived from Italy for a total of 16 rolling gates that each weigh an estimated 3,100 tons. The construction of the third set of locks will allow the passage of post-Panamax vessels or container ships much too big to fit through the Panama Canal’s old locks.

Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.