1 min read

PORTLAND (AP) — An investigation into the cause of a fire that destroyed a wind turbine at New England’s largest wind farm is expected to wrap up within a month.

The Jan. 16 blaze, the first reported turbine fire in Maine, burned out the gear box at the top of one of the 44 turbine towers at the Kibby Wind farm in northern Franklin County, said Grady Semmens, spokesman for the company that owns the farm. Nobody was injured and the fire burned itself out before it could spread, he said.

The turbine appears to be beyond repair, Semmens said, but the company, TransCanada, hasn’t decided if it will be replaced.

The decision is “subject to the investigation in terms of the cause and what that’ll mean for a potential insurance claim,” he said.

Calgary, Alberta-based TransCanada doesn’t disclose the cost of its turbines, but a large, commercial-scale turbine could cost several million dollars. The entire Kibby Wind farm was built at a cost of $350 million.



Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.