PORTSMOUTH, N.H. (AP) — The new Memorial Bridge connecting New Hampshire and Maine is still on track to open this summer.
But the exact date is still to be determined.
Transportation officials say when the contractor in charge is satisfied the lift bridge is operating smoothly, maintenance crews will need specialized training to take over operations.
Even when the bridge opens, its approaches and other areas will still be under construction into the fall.
The bridge is replacing a nearly 90-year-old bridge connecting Portsmouth to Kittery.
With the bridge under construction and Sarah Mildred Long Bridge closed for repairs, the only bridge between the cities open to traffic is the Piscataqua River Bridge on Interstate 95.
Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.
We believe it's important to offer commenting on certain stories as a benefit to our readers. At its best, our comments sections can be a productive platform for readers to engage with our journalism, offer thoughts on coverage and issues, and drive conversation in a respectful, solutions-based way. It's a form of open discourse that can be useful to our community, public officials, journalists and others.
We do not enable comments on everything — exceptions include most crime stories, and coverage involving personal tragedy or sensitive issues that invite personal attacks instead of thoughtful discussion.
You can read more here about our commenting policy and terms of use. More information is also found on our FAQs.
Show less