KITTERY (AP) — The north span of the new Memorial Bridge connecting New Hampshire and Maine is getting ready for its big entrance.
The span is expected to be floated in at about 1 a.m. Wednesday. Stephen Del- Grosso of contractor Archer Western tells the Portsmouth Herald the tide and currents dictate that the float-in start early.
The move toward the Kittery side of the bridge would be completed by 8 a.m.
The barge Cape Cod — on which the north span is being built at the Port of New Hampshire — is expected to be moved through the Sarah Mildred Long Bridge this afternoon, then be tied up on the downriver side awaiting the float-in.
The new Memorial Bridge connecting Portsmouth and Kittery is scheduled to open to traffic this summer.
Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.
We believe it's important to offer commenting on certain stories as a benefit to our readers. At its best, our comments sections can be a productive platform for readers to engage with our journalism, offer thoughts on coverage and issues, and drive conversation in a respectful, solutions-based way. It's a form of open discourse that can be useful to our community, public officials, journalists and others.
We do not enable comments on everything — exceptions include most crime stories, and coverage involving personal tragedy or sensitive issues that invite personal attacks instead of thoughtful discussion.
You can read more here about our commenting policy and terms of use. More information is also found on our FAQs.
Show less