BRUNSWICK
The cancellation of two weekday trains this week due to track repairs is not affecting ridership in Brunswick and Freeport, although most Downeaster trains are experiencing delays.
Most delays along the entire route are under 30 minutes, according to Patricia Quinn, executive director of Northern New England Passenger Authority, which manages passenger service between Brunswick and Boston. Some delays, however, have stretched to about 45 minutes.
On Tuesday, the 682 southbound train departing Brunswick at 7:05 a.m. and Freeport at 7:20 a.m. left on time but arrived in Boston 36 minutes late, according to Quinn.
The 688 southbound train which departs at Brunswick and Freeport in the evenings arrived in Boston 46 minutes late.
Northbound train 681, scheduled to arrive in Freeport and Brunswick at 12:10 p.m. and 12:25 p.m., respectively, was nearly a half-hour late.
The 685, scheduled to arrive in Freeport and Brunswick at 8:05 p.m. and 8:20 p.m., respectively, arrived 19 minutes late.
Joan Edwards, manager at the Brunswick Visitors Center at Brunswick Station, said that she has not heard many complaints.
“People seem to sit and wait,” she said. “Nobody has told me that it’s screwed them up.”
Edwards said she has seen the train from Boston arriving between 30 and 40 minutes late this week.
Updates about the delays are well posted at Brunswick Station, Edwards said, and passengers are “dealing with it.”
The canceled trains are the northbound Train 683, which departs Boston at 2:05 p.m. and arrives in Portland at 2:05 p.m., and the southbound Train 686 which leaves Portland at 2:35 p.m. and arrives in Boston at 5:05 p.m.
Those trains run weekdays. Quinn said those trains were canceled to “mitigate the cascading affect” caused by delays. Neither train makes stops in Freeport or Brunswick, and Quinn said she was optimistic the trains would be running again next week.
The cancellations and delays are occurring because of repairs on track owned by Pan Am Railways — on which the Downeaster travels — between Portland and Boston, according to Quinn.
Quinn likened the issues with the rails to the effect frost heaves have on roadways. The tracks routinely go through maintenance after the spring thaw, but the severity of this winter has caused more damage than in years past, said Quinn. That’s led to more repairs, and thus delays.
Much of the repairs include adjusting the rail ballast, and also tie replacement and some rail replacement, said Quinn.
Quinn said she is unable to pinpoint when repairs to the track will be completed.
“It depends on what gets accomplished,” she said.
Check the status of the train schedule by calling (800) 872-7245 or visit www.AmtrakDowneaster.com.
jswinconeck@timesrecord.com
Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.
We believe it's important to offer commenting on certain stories as a benefit to our readers. At its best, our comments sections can be a productive platform for readers to engage with our journalism, offer thoughts on coverage and issues, and drive conversation in a respectful, solutions-based way. It's a form of open discourse that can be useful to our community, public officials, journalists and others.
We do not enable comments on everything — exceptions include most crime stories, and coverage involving personal tragedy or sensitive issues that invite personal attacks instead of thoughtful discussion.
You can read more here about our commenting policy and terms of use. More information is also found on our FAQs.
Show less