1 min read

PORTSMOUTH, N.H. — A group that has been studying replacement or repair options for two bridges between Maine and New Hampshire are looking at a so-called hybrid structure that wouldn’t need to be raised as often.

Members of the Maine-N.H. Connections Study group say one option for replacing the Sarah Mildred Long Bridge between Kittery and Portsmouth would be a double-lift bridge based on one in Portland, Ore. That bridge has a lower deck for railroad and pedestrian traffic and an upper deck for cars.

Foster’s Daily Democrat reports that the study group is considering a bridge with a higher structure so that the lift portion would only have to be engaged when the tallest of ships pass down the Piscataqua River.

 

Comments are no longer available on this story