Construction on the new middle school won’t be complete for another year, but sixth-grade teacher Collette Gagnon knows exactly where her classroom will be.
“I’m going to have windows!” Gagnon exclaimed as she toured the new building Friday.
Windows, she said, would be just one of the many improvements from her Wescott Junior High School classroom.
“It’s a wish come true,” she said.
City and school officials, faculty and a few students last week got a first look at the new school, slated to open for occupancy in the spring of 2010. Residents voted in 2007 to approve the $29.4 million school and to authorize $4.1 million in local spending to pay for the auditorium. The estimated cost for the project is $33.7 million, with the state paying about $26 million. Construction of the building, which sits on 65 acres off Stroudwater Street, is about half-way complete.
“It’s amazing how far they’ve come along,” said Brian Mazjanis, principal of Wescott Junior High School and future principal at the middle school. “It’s going to be a gorgeous building.”
Dan Cecil of Harriman Associates, lead architect of the middle school, said Friday he’s been impressed with the number of residents who have been involved through numerous committees in the construction of the school.
“What’s been really great about working here is the community spirit Westbrook has,” he said. “It’s been an incredible experience for me.”
The importance of community was brought into mind when building the middle school, which from the front entrance, opens into a two-story common area, which Cecil described as a place to gather, “like a city square.”
However, security of the students is taken into account. Visitors will have to check in before gaining entrance to the building at the administrative offices, which have open windows into the common space, making it easy for the staff to monitor the area.
“Transparency is a very big thing in the design of this building,” Cecil said.
Across from the offices is the cafeteria, which seats 300, but can be divided into three smaller sections to be used for meetings or as a place to sell refreshments during the intermission of a play or at halftime during a basketball game in the gymnasium beside it.
The gym has large windows that let in the daylight. Even on a cloudy day in January, Cecil said, “you could turn off the lights and still play basketball” – one of the many ways the building will save energy. The full-size court with 600 bleacher seats could accommodate high school games, as well, Cecil said.
At the back of the common space are the stairs leading up to the auditorium, which seats 1,000 people and features a catwalk and a large “very high quality professional stage,” Cecil said.
He said the gym connects to the theater and can act as a green room for larger events held on the stage. The music and band rooms, off a hallway behind the gym, connect to the auditorium, as well.
For those attending performances, the upstairs lobby can also act as a gathering space. Open in the center, it looks over the first floor lobby and leads to the library.
From the first floor, the classroom wing is connected to the lobby by a hallway. The guidance, special education and nurse’s rooms are separated from the nine classrooms, which include three science labs, by another common space that can be used as place where students can get out of the classroom to gather and work on projects.
Cecil said the common area helps break the 135,000-square-foot building into smaller pieces, and from the windows, planes can be seen flying to and from the Portland Jetport.
Six of the classrooms feature double doors, so students can move easily from one room to the next, encouraging more collaboration.
“It’s awesome,” said Gabriella Latini, a sixth-grade student at the junior high, about the middle school.
Mazjanis said students and staff will move into the new school as soon as it’s ready, regardless of when it falls in the school year. But plans for what to do with the old junior high still haven’t been solidified.
According to Al Juniewicz, co-chairman of the junior high school re-use committee, there are three possible plans on the table. The grandest includes a new hockey rink and an Olympic-sized pool in one portion, while the rest of the building would hold the offices of the school and city administration and community organizations.
The second option would see the same office uses without the new pool or hockey rink, and the third – what Juniewicz believes is most likely at this point – would have the front end of the building unused for the time being, while keeping the pool and gym that are already there open for public use.
Juniewicz said the committee is still hoping to be able to conduct a comprehensive study of the costs and feasibility of all three plans, but that study would cost $20,000 alone, he said, and finding that money in the city’s budget at this time isn’t something he believes is likely.
The re-use committee next meets on Thursday, March 19. Juniewicz said he hopes some decisions will be made then.
Meanwhile, Rene Daniel, co-chair of the middle school building committee, said, as impressive as the building might be now, he expects its appearance to make huge strides in the coming months.
“We’ve come a long way,” he said, “but you will not believe this place in six weeks, 12 weeks, 18 weeks.”
Comments are no longer available on this story