Bath Iron Works is one of four shipyards vying for the contract, along with Austal USA of Alabama, Huntington Ingalls of Mississippi and Fincantieri Marinette Marine of Wisconsin.
BIW
Navy requests Bath-built destroyer replace submarine in 2021 budget
The destroyer, which Bath Iron Works can compete to build, would inch the Navy closer to the Trump Administration’s 355-ship naval fleet goal, which Congress made law in the 2018 National Defense Authorization Act.
Bath-built USS Fitzgerald repaired and undergoing tests after fatal collision
Mississippi-based Huntington Ingalls Industries, Bath Iron Works’ competitor, was awarded $523 million to repair and modernize the Arleigh Burke-class destroyer after it collided with a container ship off the coast of Japan in 2017.
BIW battling bed bugs
A union representative said the shipyard has taken steps to isolate and control the pest problem.
Bath Iron Works battling bedbugs
A union representative says the shipyard has taken steps to isolate and control the pest problem.
Maine Voices: ‘Good old boys club’ management has cost BIW its workers’ trust
If shipyard managers want productivity to rise and labor-hour costs to fall, they should look to the Golden Rule.
Despite proposed cuts, Pingree ‘confident’ Bath shipyard will fulfill contracts
Department of Defense recommended slashing the number of Arleigh Burke-class destroyers built for the Navy between 2021 and 2025 from 12 ships to seven.
Members of congressional subcommittee visit BIW amid talk of cuts
Reports that the Navy was considering shipbuilding cuts and accelerated retirements of ships came as a surprise to many last month.
Union official: BIW doesn’t need subcontractors to stay competitive
After getting pay concessions and tax breaks, the company should be ready to fulfill its obligation to the U.S. defense manufacturing sector.
Bath Iron Works begins construction on ship named for war hero
The future USS John Basilone is one of five vessels under construction at the Bath shipyard.