In writing in favor of last year’s $41.5 million bond to overhaul South Portland High School, we said, “So while it is not perfect, we support the bond proposal because the best money a city can spend is on education. We support it because much of the work in the proposal will have to be done soon anyway, the cost is always rising, and the time to move this project forward is now.”
For much the same reasons, we are urging a yes vote Nov. 8 in Scarborough for the $39.1 million bond to build a new Wentworth Intermediate School.
The argument for replacing Wentworth is so strong that it has hardly been in dispute during the campaign. Since Wentworth was built in 1962 as a junior high, it has been expanded once by new construction, in 1974, and then again in the 1980s and ’90s through the addition of portable buildings. The result is a sprawling mish-mash of a school that forces students on the far end of a wing to walk the equivalent of 21?2 football fields to get to a bathroom. The building itself is in advanced disrepair, the heating system is inefficient, the educational spaces cramped and there are questions about air quality and asbestos.
The only real debate has been regarding the size and timing of the project. The design for the new school calls for 40 classrooms and a total of 163,000 square feet, around 56,000 square feet larger than the school is now.
The size may seem excessive at first glance, but those numbers only tell part of the story. The school now is certainly not big enough for its 775 students, so a larger building is necessary, as is one that can handle any unexpected jumps in enrollment. Wentworth also is more than just a school, as it plays host to a number of community events and organizations, and houses the food service for grades K-5, meaning the community as a whole would benefit from a larger building.
Also, when voting, residents should consider the $1.6 million that has been put into Wentworth since 2006 to handle only a fraction of the maintenance problems boiling over at the school, and wonder just how much more would have to be put into the school if a new one is not built.
Still, the price tag of the new Wentworth school – which town officials peg at $53.7 million-$66.3 million over the life of the bond – and its impact on taxes – the average annual bill would go up $138 – is enough to give pause, especially given the difficult budget year ahead for schools and local governments. The town has limited dollars to spend, and in putting forward the bond proposal now, school officials are saying a new school is worth whatever budget cuts may be necessary as a result.
So residents should support the Wentworth referendum to further strengthen education in Scarborough, while town and school officials prepare to make some difficult decisions come budget time.
Ben Bragdon is the managing editor of Current Publishing. He can be reached at bbragdon@keepmecurrent.com or followed on Twitter.
Comments are no longer available on this story