Drivers on Route 25 can see the progress of the Gorham bypass on their way to and from Standish. Less visible but equally important to the future of transportation in the region are the nearby railroad tracks just purchased by the state.
At an estimated $28 million dollars, the first phase of the Gorham bypass is now being linked to Route 25. It will curve around town to meet Route 114 south of the center of Gorham, a trip of less than five miles.
For $14 million more, and $7 more than the estimated cost of a northern phase two bypass around Gorham, passenger rail service could be restored for commuters from Fryeburg to Portland on more than 50 miles of the old Mountain Division line.
The state bought more than five miles of rail line running from Westbrook to Windham. The purchase completes the link to Portland. With the track in hand, the Department of Transportation estimates the cost of restoring passenger rail service to be $42 million. The cost, especially if partly funded federally, is a bargain.
A Legislature that constantly grapples with budget deficits might think twice before creating bond measures which increase debt on future budgets. No second thought is needed here. A bond to pay for full railroad service would be a great down payment against a future where gas and diesel fuel prices could easily be 100 or 200 percent higher than what consumers face now.
Crude oil prices tumbled $22 a barrel in the last week, but are still roughly $55 a barrel more than last year. The swift descent from more than $146 a barrel is a relief, but a temporary one unless demand for oil is reduced.
The higher gas prices this year have brought more riders to the Amtrak Downeaster trains and Zoom bus running from Biddeford to Portland.
Restoring train service through Windham, Standish, Sebago and Baldwin would decrease traffic on roads as gas prices increase, and save towns and the state money on road repairs caused by overuse.
The restoration cost up front is substantial, but the material needed for road repair is petroleum-based. Towns and the Department of Transportation already put off projects on existing roads because of inflated costs.
Gas at $5 a gallon or higher could lead drivers to embrace commuting by train and even alleviate the need for future repairs. Fewer vehicles might also alleviate the need for another bypass.
Businessmen such as quarry owner Stephen Estes of Baldwin have embraced restoring rail service on the Mountain Division line as a way or reaching new markets without adding the cost of trucking products from Baldwin to the bill.
In the time it takes to restore rail service, the fuel efficiency for vehicles could substantially improve with more hybrid cars on the market, better mandated fuel standards and more alternatives to power combustion engines.
It’s unclear whether those vehicles will be affordable, and trains may still be the more economical choice for commuters.
The choice paraphrases an old TV commercial “pay me now or pay me later.” Paying now is the better choice.
David Harry, editor
Comments are no longer available on this story