
NEW GLOUCESTER – The new $4.6 million public works complex officially opened this week and no longer will plow truck drivers have to ditch the plows and blades to get inside.

The facility at 611 Lewiston Road replaces the Upper Gloucester village garage and salt/sand shed.
Highway Department Director Ted Shane and interim Town Manager Paul First showed off the 22,000-square-foot garage and the domed sand/salt building Wednesday.
The mechanic’s bay can service the town’s 12 public works and eight Fire Department vehicles. No longer will plows have to be removed from trucks in order to get under cover. And sand and salt will be loaded inside the shed, which holds 7,000 cubic yards of material.

There is LED lighting throughout the facility, shower rooms for staff and a 1000-kilowatt generator in case of power failure. Other features include a high-efficiency heat pump, a waste oil furnace, a waste oil storage tank with secondary containers to prevent spills, and a wash bay with a 20,000-gallon storage system to recycle water.
Public tours will be held in the spring.
Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.
We believe it's important to offer commenting on certain stories as a benefit to our readers. At its best, our comments sections can be a productive platform for readers to engage with our journalism, offer thoughts on coverage and issues, and drive conversation in a respectful, solutions-based way. It's a form of open discourse that can be useful to our community, public officials, journalists and others.
We do not enable comments on everything — exceptions include most crime stories, and coverage involving personal tragedy or sensitive issues that invite personal attacks instead of thoughtful discussion.
You can read more here about our commenting policy and terms of use. More information is also found on our FAQs.
Show less