
The second Zumwalt-class stealth destroyer has passed its sea test.
A statement from Naval Sea Systems Command says the future USS Michael Monsoor successfully completed its acceptance trials Thursday.
The Portland Press Herald reports the statement says onboard systems such as navigation, damage control, mechanical, combat, communication and propulsion met or exceeded specifications.
The 610-foot-long Monsoor headed out to sea for the first time in December. Its first sea trials were cut short because of equipment failures.
The Monsoor is the second built at Maine’s Bath Iron Works in a class of three futuristic-looking ships that feature electric-drive propulsion, new radar and sonar, powerful guns and missiles and a stealthy shape.
The cost of the three Zumwalt-class destroyers is estimated at $22 billion, the most expensive Navy destroyers ever built.
Comments are not available on this story. Read more about why we allow commenting on some stories and not on others.
We believe it's important to offer commenting on certain stories as a benefit to our readers. At its best, our comments sections can be a productive platform for readers to engage with our journalism, offer thoughts on coverage and issues, and drive conversation in a respectful, solutions-based way. It's a form of open discourse that can be useful to our community, public officials, journalists and others.
We do not enable comments on everything — exceptions include most crime stories, and coverage involving personal tragedy or sensitive issues that invite personal attacks instead of thoughtful discussion.
You can read more here about our commenting policy and terms of use. More information is also found on our FAQs.
Show less